Dominic's modern wet room
A sparse bathroom with a high step-up shower, rebuilt as one level-access wet room, fitted in five days by our own team.
Time to complete
5 Days
Date completed
14/02/2026
Service
Wet Room
The transformation
See the difference at a glance
The same bathroom, photographed before we started and after we finished.
The story
How Dominic's wet room took shape
1
The challenge
A room that gave nothing back
Dominic’s bathroom had a walk-in shower with a high step up, and little else working in its favour. The space felt bare and impractical, and he wanted a modern room that would support him now and as his needs change.
2
Our solution
Level, low-maintenance, done properly
We ripped the old bathroom out completely, right back to the bare walls. That gave us a clean start for a fully level-access wet room: anti-slip flooring for safety underfoot, wall panelling that keeps cleaning simple, and a padded fold-down seat with armrests for comfortable showering. A new sink with an easy lever tap, a mirrored cabinet and a heated towel rail complete the room.
Watch it happen
Dominic's before & after, in under two minutes
Watch how the team at Age Care Bathrooms transformed Dominic’s bathroom.
Always included
What every installation includes
Whatever the solution, every Age Care accessible bathroom comes with the same standards of care.
Professional CAD design service
A free, no-obligation home visit
Grab rails fitted around your needs
All waste removed & recycled
Installed by our employed experts
Easy clean walls & flooring
Keep exploring
More installations you'll love
Here to help
Have a question? Talk to our team
No pressure and no obligation, just honest, friendly advice about what would work best for your home.
Lines open Monday to Friday, 9am–5:30pm · Freephone from UK landlines and mobiles.







